Saturday, August 24, 2013

Conejo floor sheeting

After all the floor joists were finished we installed the sewer lines and started sheeting the floor and getting the garage ready to pour the concrete.

Conejo floor joists

With the stem wall complete we installed all the first floor joists. 

Conejo stem walls

When the stem walls were finished we poured one concrete truck to fill all the walls.

Conejo stem walls

After the grade beams were poured we installed block walls.

Conejo Foundation


To cut down on costs I was able to find some cheap machine operators.



Conejo Foundation

After two weeks of tying rebar together to connect the caissions we poured another 5 concrete truck loads of concrete.

Conejo Foundation

After the concrete pump has placed all of the concrete from 3 concrete trucks only 2 feet of rebar is left sticking up in the air.