Saturday, August 24, 2013
Conejo Foundation
After two weeks of tying rebar together to connect the caissions we poured another 5 concrete truck loads of concrete.
Conejo Foundation
After the concrete pump has placed all of the concrete from 3 concrete trucks only 2 feet of rebar is left sticking up in the air.
Conejo Foundation
Since this lot has very unstable soils we ended up drilling a 35 foot deep hole by 18" wide, then dropped the rebar cage into the hole. We did this 9 times and there were 13 caissons existing.
Subscribe to:
Posts (Atom)







.jpg)